Subdivision design sketches

Equal-area band splits of title 51123/1 (69.25 ha) into two and three lots, generated from the mapped constraint stack and scored against the desk tests. Cut orientations: north–south, east–west, and perpendicular to the parcel's long axis.

An appendix to the subdivision report, not a proposal. This is a working artifact (noindex): naive equal-area band-split sketches plus the access-network caveat that reframes them. What the sketches show, previewed: two-lot geometry is the easy case; three lots always leave one lot with no clear building envelope; and access is the unscored dimension — the sketches below show why. The interpretive point is the access network these sketches ignore.

Draft — illustrative only. Assumption Risk These are desk sketches at mapped-layer resolution: not a survey, not a proposal, no boundary here is proposed. Frontage/access design, BAL-19 footprints, wastewater siting and and wastewater siting all precede any real layout. Scores use LISTmap overlays and the C/D/E corridor as confirmed by the Edition 8 folio search of 17-Jul-2026.
Priority vegetation Landslip bands Waterway protection C/D/E easement corridor

Score columns: ≥20 ha = lot meets the minimum-lot-size desk test · PVA = share of the lot mapped as priority vegetation · non-PVA ha = area outside that vegetation · clear ha = non-PVA area also clear of the other mapped constraints (landslip, waterway) · 25×25 fits = a constraint-clear 25 m × 25 m building area fits · touches C/D/E = lot meets the mapped easement corridor.

Read these against the access network they ignore

These grid sketches are deliberately naive baselines. They cut equal-area bands and ignore the parcel's real access network — read every score below with that caveat. The terrain-following design that uses it is on the main subdivision report, §02b — its Lot 2/3 boundary is anchored where the internal track enters the upper parcel. Fact — see report

The internal south–north track is distinct from the C/D/E easement corridor. Owner-attested and desk-verified on LIST: 823 m of mapped vehicular track runs inside the title (the main segment 747 m, bearing ~344°), of which only 0.3% overlaps the mapped C/D/E footprint — two separate features. Crown Casement/Reserved-Road cadastral parcels adjoin the boundary: 1,231 m shared on the east, 530 m on the west. Neighbouring blocks rely on the internal track for access (owner-attested). Fact — computed from LIST cadastral data (July 2026), EPSG:28355 Risk — a reserved road on paper is not a formed road; no access rights inferred Todo — Crown Lands register extract; the east reserved road may change Lot 3's access story

Where use and rights diverge, there is a design and a negotiation. The seven registered easements burden ways C, D, E as drawn on Diagram 51123. If neighbours' actual access runs on the track instead, formalising it — realigned or new easements, surveyed once for everyone — is a candidate shared-cost exercise (neighbours contributing to survey work) and, where a party gains a right it does not currently hold, a priced grant. The same surveyed spine could serve new lots here. Choice — owner's capital-unlock play Risk — never price or assert rights over ways already registered Todo — lawyer + surveyor before any approach to neighbours; long-user rights may already exist

Two lots (~34.6 ha each)

Design A: 2 lots, north–south cuts

All lots pass the desk tests

Cuts run north–south; lots read west to east.

Lot 1 · 34.6 haLot 2 · 34.6 ha
ha≥20 haPVAnon-PVA ha clear ha25×25 fitstouches C/D/E
Lot 134.6285.3%5.113.79
Lot 234.6297.4%0.920.83

Design B: 2 lots, east–west cuts

1 lot(s) fail a desk test

Cuts run east–west; lots read south to north — the orientation most likely to separate the two non-PVA fragments (they sit ~580 m apart north–south).

Lot 1 · 34.6 haLot 2 · 34.6 ha
ha≥20 haPVAnon-PVA ha clear ha25×25 fitstouches C/D/E
Lot 134.6282.9%5.924.62
Lot 234.6299.7%0.10.0

Design C: 2 lots, long-axis cuts

All lots pass the desk tests

Cuts perpendicular to the parcel's long axis — the most even lot proportions.

Lot 1 · 34.6 haLot 2 · 34.6 ha
ha≥20 haPVAnon-PVA ha clear ha25×25 fitstouches C/D/E
Lot 134.6284.8%5.253.94
Lot 234.6297.8%0.770.68

Three lots (~23.1 ha each)

Design D: 3 lots, north–south cuts

1 lot(s) fail a desk test

Cuts run north–south; lots read west to east.

Lot 1 · 23.1 haLot 2 · 23.1 haLot 3 · 23.1 ha
ha≥20 haPVAnon-PVA ha clear ha25×25 fitstouches C/D/E
Lot 123.0882.0%4.163.15
Lot 223.0891.9%1.861.47
Lot 323.08100.0%0.00.0

Design E: 3 lots, east–west cuts

1 lot(s) fail a desk test

Cuts run east–west; lots read south to north — the orientation most likely to separate the two non-PVA fragments (they sit ~580 m apart north–south).

Lot 1 · 23.1 haLot 2 · 23.1 haLot 3 · 23.1 ha
ha≥20 haPVAnon-PVA ha clear ha25×25 fitstouches C/D/E
Lot 123.0878.7%4.923.88
Lot 223.0895.2%1.10.73
Lot 323.08100.0%0.00.0

Design F: 3 lots, long-axis cuts

1 lot(s) fail a desk test

Cuts perpendicular to the parcel's long axis — the most even lot proportions.

Lot 1 · 23.1 haLot 2 · 23.1 haLot 3 · 23.1 ha
ha≥20 haPVAnon-PVA ha clear ha25×25 fitstouches C/D/E
Lot 123.0882.0%4.163.15
Lot 223.0891.9%1.861.47
Lot 323.08100.0%0.00.0

What the sketches say

Two lots is the easy geometry. In the north–south and long-axis splits both lots clear every desk test (≥20 ha, a constraint-clear 25 m × 25 m building area); only the east–west split strands the northern lot without an envelope. Fact — mapped resolution

Three lots always leaves one lot with no non-PVA envelope. There are only two non-PVA fragments, so under any equal-area band split the third lot is 100% priority vegetation: its building area defaults to the C7.7.2 performance test (P1), the discretionary battleground the report describes. The east–west 3-lot split is the strongest of the three — every lot touches the C/D/E corridor and two of three fit clear envelopes. Fact — mapped resolution Assumption — P1 acceptance

Access is the unscored dimension. The C/D/E corridor (shared with seven — possibly eight — benefited neighbours) reaches only part of the parcel; lots not touching it need new access design and the A2/P2 frontage test. No sketch here addresses road construction, wastewater or BAL-19 footprints. Risk Todo

02c — contour-derived Lot 1 line; track-bearing Lot 2/3 line

Design 02c: 3 lots — Lot 1 line snapped to real contour vertices, Lot 2/3 line parallel to the internal track

All lots ≥20.05 ha

02b (above, on the main subdivision report) draws its Lot 1 boundary from a hand-picked waypoint list "loosely inspired by" contours, and its Lot 2/3 boundary from an arbitrary 18° bearing. This design replaces both with boundaries computed from the harvested data layers: the Lot 1 | Lots 2+3 line is built by sampling every 25 m across the parcel and snapping to the nearest real 10 m-contour vertex within 60 m of a guide trend (elevations 360–440 m all contribute vertices — the terrain here runs roughly north–south, not east–west, so no single contour level cleanly separates the two non-PVA fragments — which is why a single elevation band doesn't work). The Lot 2 | Lot 3 line takes the real internal vehicular track's own start-to-end bearing (342.1°), anchored where the track crosses Lot 1's boundary — but a line on the track splits the northern ground 7.5 / 34.5 ha and fails the floor, so the anchor is shifted 290 m perpendicular to reach 21.0 / 21.0 ha. Choice At that offset the line runs parallel to the track, not along it: the track contributes the bearing, and the 290 m is chosen to satisfy the area floor, not read off any feature on the ground. Choice Drainage lines (Constance Rivulet + unnamed reaches) were checked as an alternative for the Lot 2/3 line and rejected — none run north–south through that part of the parcel; the track-bearing line was used instead and drainage is shown only for visual cross-check. Assumption Areas below are computed geometry (EPSG:28355), not surveyed; this remains an unsurveyed concept, not a proposal.

Toggle layers to check the boundary against the terrain it claims to follow. Base layer is the LIST orthophoto.

ha≥20.05 haPVAnon-PVA ha clear ha25×25 fitsfrontage mtouches C/D/Egradient

What changed vs 02b. Lot areas moved slightly (Lot 1 27.28 ha vs 02b's ~28.8 ha; Lots 2/3 ~21.0 ha each vs 02b's 20.3/20.1 ha) because the boundary now follows actual contour vertices and the track's real bearing rather than hand-tuned points. Fact — computed geometry Fragment 1 stays in the south lot and Fragment 2 in a northern lot in both designs — that containment constraint, not the exact line shape, is what the desk tests actually depend on. Todo Neither design is a substitute for a surveyor's traverse; both are desk-resolution GIS sketches at mapped-layer accuracy.